What was found
CORROSION ON INTERCOSTAL AT AFT CARGO BAY BS827+18 RBL6. / [01] REMOVED CORROSION ON INTERCOSTAL AT AFT CARGO BAY BS827+18 RBL6 AT DISCREPANCY AREA BS.827+18 L=2.000' W=2.000' D= 0.023' ORIGINAL THCKNESS 0.045' REMAINING MAT 0.022 MAT LOSS 0.023 FONUD TO BE OUT OF LIMITS IAW SRM SRM 53-60-15-1A-1 USED TOOL ATS ID 1672 DUE 03/2023 VERIFIED SRM APPLICABILITY AND OUT OF LIMITS PER SRM 53-60-15-1A-1 STEP 4.C 2;[02] REMOVED INTERCOSTAL AT AFT CARGO BAY BS 827 TO 847 RBL6 IAW SRM 51-40-02;FORMED INTERCOSTAL; AT AFT CARGO BAY BS 827+18 RBL 16 WITH MATERIAL ( 7075 T0 # .045' ) LOT .1480084-1 IAW SRM 51-30-01-0G-0 DWG 146A8131;[05] VERIFIED CORRECTIVE ACTION STEP 4.;[06] LOCATED AND DRILL FORMED INTERCOSTAL; AT AFT CARGO BAY BS 827+18 RBL 16 WITH MATERIAL ( 7075 T0 # .045' ) LOT .1480084-1 IAW SRM 51-30-01-0G-0 DWG 146A8131 APPLIED CHEMICAL CONVERSION COATING AND PRIMER ON FORMED INTERCOSTAL ; AT AFT CARGO BAY IAW SRM 53-60-15-1A-1;ALLOWABLE DAMAG 2 STEP 2B;C OK TO INTALL.;[09] VERIFIED ACTION #8; OK TO INSTALL GIVEN;[10] INSTALLED NEW INTERCOSTAL AT ACB BS27 - BS847; RBL16; WL154 PER DWG 146A8130 AND SRM 51-40-02-0G-0;[11] INSTALLED NEW INTERCOSTAL AT AFT CARGO BAY BS827 - BS847; RBL16; WL154 PER DWG 146A8130 AND SRM 51-40-02-0G-0;[12] UPDATED MEASUREMENT TABLE=PART NUMBER;[13] CORRECTION TO ACTION ITEM 8=APPLIED CHEMICAL CONVERSION COATING AND PRIMER ON FORMED INTERCOSTAL ; AT AFT CARGO BAY IAW AMM 51-21-72-370-804 AND AMM 51-21-41-370-802 ;