What was found
AFT CARGO R/H TRANSITION ANGLE HAS EVIDENCE OF CORROSION AT FASTENER HOLES FROM STA. 727I TO STA. 767. / [01] COMPLIED WITH TOOL AND MEASUREMENT REQUIREMENTS.;[02] REMOVED CORROSION FROM AREA PER SRM 53-00-53-1A-2 (0.006 DEPTH) .<BR>TRANSITION ANGLE IS OUT OF LIMITS PER SRM 53-00-53-1A-2.;[03] REMOVED RH TRANSITION ANGLE STA 727E+10' TO STA 767; RBL 22 PER SRM 51-40-02.;[04] LOCATED AND DRILLED HOLES FROM STA 727E+10 TO STA 767PER SRM 51-40-05;[05] VERIFIED C/W RAY LINCH (TECHNICIAN); 04-AUG-2022 09:15 UTC<BR>LOCATED AND DRILLED HOLES FROM STA 727E+10 TO STA 767PER SRM 51-40-05;[06] TREATED AND PRIMED NEW TRANSITION ANGLE SECTION PER SRM 51-20-01 AND SOPM 20-41-02.;[07] INSPECTED WORK PERFORMED;[08] INSPECTED WORK PERFORMED ON C/A #6;[09] STEP 2 INSLALLED BONDED NUTPLATES TO NEW SIDEPLATE SECTION PER SRM 51-40-10;[10] C/W STEP 2 INSPECTION. LINCH; RAY (COMPLETE)<BR>05-AUG-2022 06:13:38<BR>INSLALLED BONDED NUTPLATES TO NEW SIDEPLATE SECTION PER SRM 51-40-10;[11] OK TO INSTALL TRANSITION ANGLE;[12] INSTALLED TRANSITION ANGLE SPLICE AT STA 727E+10'<BR>PER SRM 53-00-53-2R-5.;[13] RII: INSPECTED WORK PERFORMED ON C/A #12;[14] INSTALLED NEW TRANSITION ANGLE SECTION STA 727E+10 TO STA 767 <BR>PER SRM 53-00-53-2R-5.;[15] VERIFIED INSTALLED NEW TRANSITION ANGLE SECTION STA 727E+10 TO STA 767 <BR>PER SRM 53-00-53-2R-5.;[16] REMOVED AND REPLACED RH TRANSITION ANGLE STA 727E+10' TO 767; RBL 22 PER SRM 53-00-53-2R-5; REPAIR 5.