What was found
' CORROSION' AFT CARGO COMPARTMENT RH STA 727B TO 727C STR25R Z-CHANNEL SPOTS OF CORROSION / [01] FOUND EXFOLIATED CORROSION AT AFT CARGO COMPT RH STA 727B TO 727C STR25R Z-CHANNEL OUT OF LIMITS PER REF B737-700 SRM 51-10-02-0G-0;[02] VERIFIED 1;[03] CUT AND REMOVED DAMAGE AT AFT CARGO COMPT R/H ZEE CHANNEL STR25R FROM STA 727 TO STA 727B +12' PER REF B737-700 SRM 53-00-53-2R-5;[04] VERIFIED 3. OK TO LOCATE AND DRILL HOLES;[05] FABRICATED AND LOCATED AND DRILLED NEW REPAIR SPLICE AND ZEE CHANNEL SECTION FROM STA 727 TO 727B +12' AT AFT CARGO COMPT STR25R PER REF B737-700 SRM 53-00-53-2R-5;[06] VERIFIED STEP 5<BR>OK TO TREAT AND PRIME PARTS;[07] TREATED AND PRIMED SPLICER AND AREA AT AFT CARGO COMPT RH ZEE CHANNEL FROM STA 727 TO STA 727B+12' PER B737-700 AMM 51-21-41-370-803 AND AMM 51-21-72-370-804.;[08] TREATED AND PRIMED SPLICER AND AREA AT AFT CARGO COMPT RH ZEE CHANNEL FROM STA 727 TO STA 727B+12' PER B737-700 AMM 51-21-72-370-804 AND SRM 51-20-01-0G-0;[09] VERIFIED 8.;[10] INSTALLED NUTPLATES IN RH ZEE CHANNEL FROM STA 727 TO 727B +12' PER REF B737-700 SRM 51-40-02-0G-0;[11] VERIFIED 10;[12] OK TO INSTALL REPAIR;[13] INSTALLED REPAIR SPLICE PER REF B737-700 SRM 51-40-02-0G-0;[14] INSTALL REPAIR PER SRM 53-00-53-2R-5 AND SRM 51-40-02-0G-0;[15] VERIFIED 14;[16] C/W