What was found
R/H VAPOR BARRIER STA 663.75 HAS 6' CRACK AT RBL 33 / [01] MEASURES;[02] PERFORMED VISUAL INSPECTION AND TAP TEST AT R\H VAPOR BARRIER FOUND CRACK 6' AND CONTAMINATION PER B737 NTM 51-05-01 PART 1 ; B737SRM 51-70-04-2R-0<BR>PARAGRAPH(4.A);[03] APPLIED STOP DRILL AT THE END OF THE CRACK ON VAPOR BARRIER PER B737SRM<BR>57-10-10-2R-2 PARAGRAPH (6.B) PREPARED DAMAGED AREA ON VAPOR BARRIER TO APPLY 24HR DRY OUT PROCESS PER B737 B737SRM 51-70-04-2R-0 PARAGRAPH (4.D);[04] VERIFIED STEPS 1; 2 & 3.<BR>OK TO APPLY DRY OUT;[05] APPLIED DRY OUT AT VAPOR BARRIER PER B737SRM 51-70-04-2R-0 PARAGRAPH(4.D);[06] VERIFIED STEP #5.<BR>OK TO INSTALL REPAIR.;[07] REPAIRED DAMAGED AREA AT VAPOR BARRIER PER B737SRM 51-70-04-2R-0 AND PERFORMED TAP TEST ON REPAIR AREA NO DELAMINATION FOUND PER B737 NTM PART 1 <BR>51-05-01 MATERIAL USED RESIN EY3804PO#1774613 AND FIBER GLASS PO#1690463;[08] VERIFIED STEP #7.-;[09] OK TO PAINT BARRIER.;[10] PAINTED R/H VAPOR BARRIER; PRIMER AND TEFLON AS REQUIRED PER B737-700 AMM 51-21-72-370-801 (PRIMER) AND 51-21-81-370-802 (TEFLON). ACCOMPLISHED BY WILFREDO VEGA EMPL.#2504 (X269730).;[11] VERIFIED STEP 10.;[12] C/W