Service difficulty report · Rail · Boeing 737

Difficulty date
August 25, 2022
Submitted
September 21, 2022
Operation
Air carrier
Aircraft
N7878A
Make and model
Boeing 737
Aircraft serial
34320
Aircraft time
52,141 hours, 25,914 cycles
Part
Rail
Part number
146A75031
Condition
Corroded
Location
Aft Cargo Bay
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON AFT CARGO BAY RAIL AT LBL 3 BS 767+6; BS 767+16. / OUT OF LIMITS REWORK.;[03] UPDATED STEP 1;[04] APPLIED CHEMICAL CONVERSION COATING AND PRIMER REWORKED AREA ON AFT CARGO BAY RAIL AT LBL 3 BS 767+16. IAW SRM 51-20-01 AND SOPM 20-41-02.;[05] RECEIVED REPAIR CHANNEL WITH P/N: 53100004-001; LOT: 1499876-1; LOCATED AND DRILLED BTW BS 767+6; LBL3.IAW. SRM 51-40-05-0G-0; SRM 53-00-53-2R-2 REPAIR 2 PARAG. 4.I.(5). FIG. 203. SHEET10 & DWG# 53100004 OK TO INSTALL.;[06] COMPLETED STEP 1.<BR>VERIFIED CORRECTIVE ACTION 4 AND 5.<BR>OK TO INSTALL;[07] CORRECTIVE ACTION ITEM 4-5 REJECTED; CARGO RAIL DAMAGE HAS BEEN CUTOUT AT BS 767 + 6. THERE IS NO DOCUMENTATION IN THE AMT MXI UPDATE TO MATCH REPAIR ACTION AND COURSE OF ACTION; AND NDT REQUEST IS NEEDED PER SRM. NO OK TO INSTALL GRANTED AT THIS TIME.;[08] LATE ENTRY: PERFORMED TRIM OUT ON AFT CARGO BAY RAIL AT LBL 3 BS 767+6' MEASURE : L=2.34' X W=.8' IAW SRM 53-00-53-2R-2. REPAIR 2 .<BR> ALTERNATIVE 5;[09] REQUEST NDI BY FREE CRACK CONDITION PER SRM 53-00-53-2R-2 REPAIR 2 PARAG.4.E. OK TO INSTALL.;[10] NDT HFEC INSPECTED TRIM OUT AREA IAW 737 NDTM PART 6 51-00-00 PROC 23. <BR>NO CRACKS NOTED <BR>EQUIP USED: NORTEC 500D IS000681 DUE 02/23;[11] VERIFIED CORRECTIVE ACTION ITEM 4-10; OK TO INSTALL REPAIR CHANNEL..;[12] INSTALLED ON ACB REINFORCING CHANNEL AT JOGGLE LOCATION BS 767 + 6; LBL.3 IAW SRM 51-40-02-0G-0; SRM 53-00-53-2R-2 REPAIR 2. ALTERNATIVE 5. FIG.103 SHEET 10.