What was found
RH SIDE WHEEL WELL VAPOR BARRIER AT STA 663 RBL-40 CRACKED AND PRIOR REPAIR DISBONDING / [01] MEASUREMENT;[13] SUMMARY= PERFORMED VISUAL INSPECTION ON R\H VAPOR BARRIER AND FOUND CRACK OF 11' AND FOUND CONTAMINATION PER B737NTM 51-05-01 PERFORMED STOP DRILL SIZE 0.25 DIAMETER AT THE AND OF CRACK PER B737SRM 57-10-10-2R-2 STEP(6.B) PREPARED VAPOR BARRIER TO APPLY 24HR DRY-OUT PROCESS PER B737 SRM<BR>51-70-04-2R-0 PARAGRAPH(4D)APPLIED THE FABRIC REPAIR PLIES AT DAMAGED AREA AT R\H VAPOR BARRIER REF B737-700 B737SRM 57-10-10-2R-2 AND 57-70-04-2R-10 PARAGRAPH 4 D;E AND F. MATERIAL USED PO#:1690463 AND PO#: 1778994. PERFORMED VISUAL INSPECTION AND TAP TEST INSPECTION AT REPAIRED AREA; NO DELAMINATION FOUND; NO DAMAGED NOTED AT COMPOSITE MATERIAL RESTORED FINISH ON BOTH SIDES OF VAPOR BARRIER AS PER B -737-700 AMM= 51-21-72-370-804 AND AMM=51-21-81-370-802;[14] VERIFIED STEP. 13 (SUMMARY REPAIR.)