What was found
CORROSION FLOOR STRUCTURE BEAM LOCATED BS986.5 AT RBL43 AND WL208.1 AT AFT GALLEY AREA 2022-441372 / [01] EQUIPMENT P/N 38DLPLUS; S/N 120398603; DUE DATE 18-OCT-22 WAS USED;[02] TOOL USED: EDDY CURRENT EQUIPMENT P/N: NORTEC 600D; S/N: 60009161631; DUE DATE: 03-DEC-22;[03] TOOL USED FLAPSPEED PN: FPK-PRO-104; SN: PRO-3447; DUE DATE: 27-JUN-23;[04] REPAIRED FLOOR STRUCTURE BEAM UPPER CHORD LOCATED BS986.5 BTW RBL39 TO RBL 46 AND WL208.1 AT AFT GALLEY AREA IAW B737-700 SRM 53-70-51-2R-6 REPAIR 6 ALTERNATIVE 4 AND FIGURE 205.;[05] TOOL USED: EDDY CURRENT EQUIPMENT P/N: NORTEC 600D; S/N: 60009161631; DUE DATE: 03-DEC-22;[06] CORRECTED STEP 4 REPAIRED FLOOR STRUCTURE BEAM UPPER CHORD LOCATED BS986.5 BTW RBL39 TO RBL 46 AND WL208.1 AT AFT GALLEY AREA IAW B737-700 SRM 53-70-51-2R-6 REPAIR 6 ALTERNATIVE 4 AND FIGURE 205; SEE INDIVIDUAL SIGN OFF BELOW;[07] TASK COMPLETED; RII <BR><BR>SEE INDIVIDUAL SIGN OFFS BELOW