What was found
L/W I/B AFT FLAP HAS A BULGE ON THE UPPER SURFACE SKIN 23.5' FROM I/B END; 1.5' FROM T/E / REMOVED AREA OF UPPER SURFACE SKIN AND FULL DEPTH HONEYCOMB CORE FABRICATED REPLACEMENT CORE SECTION FROM BMS 4-4; TY 4-25; NPA HONEYCOMB CORE (LOT# 1095039); SOLVENT CLEANED CORE AND REPAIR AREA; INSERTED REPLACEMENT CORE INTO THE REPAIR AREA USING BMS 5-28; TY 7 COMPOUND (LOT# AK1AP8072K) AND TWO PLIES OF BMS 5-101; TY 2; GR 5 ADHESIVE (LOT# 1484596-1FABRICATED REPAIR DOUBLER FROM PRE-PRIMED 0.016' 7075 T6 ALUMINUM (LOT# 1351319-2) ACCORDING TO SRM 51-70-10-2R-0; PARA. 8.A.APPLIED REPAIR DOUBLER USING BMS 5-101; TY 2; GR 10 ADHESIVE (LOT# 1484596-1); AND VACUUM BAGGED REPAIR AREA FOR HEAT BLANKET CURE ACCORDING TO SRM 51-70-10-2R-0; PARA. 18; TRIMMED REPAIR DOUBLER; REMOVED ADHESIVE FLASH; THEN ACCOMPLISHED VISUAL AND TAP TEST INSPECTION OF THE REPAIR AREA (NO DEFECTS NOTED); ALL ACCORDING TO SRM 51-70-10-2R-0; PARA. 21.A THRU 21.C.<BR><BR>REQUEST OK TO SEAL AND REFINISH REPAIR AREA.<BR><BR>HOT BOND CONSOLE ID: NCX000526; DUE: 10/2022;[07] VERIFIED CORRECTIVE ACTION #5; #6.<BR>VERIFIED OK TO SEAL AND REFINISH REPAIR AREA.;[08] CLEANED REPAIR AREA; APPLIED CHEMICAL CONVERSION COATING TO AREAS OF BARE METAL; SEALED THE EDGES OF THE REPAIR DOUBLER USING BMS 5-95 SEALANT (LOT# 45617990F-15); THEN APPLIED PROTECTIVE AND DECORATIVE FINISHES; ALL ACCORDING TO SRM 51-70-10-2R-0; PARA. 22.<BR><BR>REPAIR TO I/B AFT FLAP T/E WEDGE IS COMPLETE.;