What was found
#2 ENGINE OVER TEMP ON CLIMB AT 1000 FT. MAX TEMP NOTED 939 C FOR 10-15 SECONDS / [01] PERFORMED ENGINE BOROSCOPE OF #2 ENGINE HIGH PRESSURE TURBINE AND ALL STAGES OF LOW PRESSURE TURBINES AS PER AMM 72-00-00-200-807-F00 AND 72-00-00-200-808-F00. NO DEFECTS NOTED. PERFORMED IDLE LEAK CHECK OF DRIVE PAD. NO LEAKS NOTED.;[02] PERFORMED ENGINE BOROSCOPE OF #2 ENGINE HIGH PRESSURE TURBINE AND ALL STAGES OF LOW PRESSURE TURBINES AS PER AMM 72-00-00-200-807-F00 AND 72-00-00-200-808-F00. NO DEFECTS NOTED. PERFORMED IDLE LEAK CHECK OF DRIVE PAD. NO LEAKS NOTED.;[03] PERFORMED FIM TASK 73-11-801 AND. FILM 77-21-801 FOUND S1 FAILED R&R CJ9 HARNESS PER AMM 73-21-06; PERFORMED ENGINE BOROSCOPE OF #2 ENGINE HIGH PRESSURE TURBIN AND ALL STAGES OF LOW PRESSURE TURBINES AS PER AMM 72-00-00-200-807-F00 AND 72-00-00-200-808-F00. NO DEFECTS NOTED. PERFORMED IDLE LEAK CHECK OF DRIVE PAD; NO LEAKS NOTED. PERFORMED AMM 71-00-00-700-813-F00 TEST 5 POWER ASSURANCE NO DEFECTS NOTED.