Service difficulty report · Support · Boeing 7377H4

Difficulty date
September 29, 2022
Submitted
October 17, 2022
Operation
Air carrier
Aircraft
N266WN
Make and model
Boeing 7377H4
Aircraft serial
32523
Aircraft time
52,718 hours, 31,500 cycles
Part
Support
Condition
Corroded
Location
Fwd Cargo
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON FWD CARGO BAY FLOOR TO SIDEWALL SUPPORT FROM STA 480+6 TO STA 500C+15 LBL 23 TO 25; WL 157. / [01] SRM 53-00-53-1A-2 IS APPLICABLE FOR THIS;[02] SRM 53-00-53-1A-2 IS FOUND TO BE APPLICABLE FOR THIS EVAL. REMOVED CORROSION FROM MANY POINTS. THE DEEPEST IS AT BS480+6 0.8 X 0.6 D=0.014. PART FOUND TO BE OUT OF LIMITS. REPAIR BY REPLACEMENT. IAW SRM 51-10-02; SRM 53-00-53-1A-2;[03] CAL TOOL INFO ID: ATS2711 S/N G01589 EXP: 02/2023;[04] VERIFIED CORRECTIVE ACTION #1-3;[05] LOCATED AND DRILLED NEW FCB FLOOR TO SIDEWALL SUPPORT FROM BS 396-500D; LBL 25; WL 157 AND SPLICE AT BS 480-500 FROM BAC1496-444#7075T62 LOT#1501239-1. APPLIED CHEMICAL CONVERSION COATING IAW SRM 51-40-05; SRM 53-00-53-2R-6; SOPM 20-43-03; BOEING DWG 143A7505 AND BOEING DWG 143A7500. OK TO APPLY PRIMER;[06] VERIFIED CORRECTIVE ACTION 5 OK TO PRIME;[07] APPLIED PRIMER TO NEW FCB FLOOR TO SIDEWALL SUPPORT FROM BS 396-500D; LBL 25; WL 157 AND SPLICE IAW SRM 51-21-72-370-804. OK TO INSTALL SPLICE;[08] VERIFIED CORRECTIVE ACTION #7<BR> OK TO INSTALL SPLICE GIVEN<BR>MEASUREMENT TABLE VERIFIED;[09] INSTALLED REPAIR SPLICE AT BS480-500; LBL 25; WL 157 IAW SRM 53-00-53-2R-6 AND SRM 51-40-02;[10] VERIFIED CORRECTIVE ACTION #9;[11] INSTALLED CLICK BOND NUTPLATES TO FCB FLOOR TO SIDEWALL SUPPORT FROM BS 396-500D; LBL 25; WL 157 IAW BOEING DWG 143A7501 AND DWG140N4500;[12] VERIFIED CORRECTIVE ACTION #11;[13] VERIFIED REPLACEMENT TASK COMPLETE

More about the Boeing 737-7H4