What was found
AFT CARGO BAY LBL 17 TIEDOWN TRACK IS CRACKED AT BS 727E WL 156 / [01] REMOVED TIEDOWN TRACK AT ACB LBL 17 BS 727 TO BS 867 WL 156 IAW SRM 51-40-02;[02] UPON FURTHER EVALUATION CRACK AT AFT CARGO COMPARTMENT TIEDOWN TRACK STA 727E; LBL 17; WL 166 LENGHT= .5'. TRACK CRACK FOUND TO BE OUT LIMITS PER SRM 53-00-53-1A-2.<BR>TOOL USED<BR>ID: ATS1317 S/N: UNKNOWN DUE DATE:08/2023.;[03] VERIFIED CORRECTIVE ACTION 2.;[04] AFT CARGO COMPARTMENT TIEDOWN TRACK STA 727E; LBL 17; WL 166 REPAIR BY REPLACEMENT OF PART PER SRM 51-10-02-0G-0 PARA 9.;[05] CORRECTION FOR ENTRY # 2; 4. CORRECT WATER LINE IS (WL 156) NOT 166.;[06] PROCURED NEW ACB TRACK; LOCATED AND DRILLED SRM 51-40-05-0G-0; SRM 51-40-02. OK TO INSTALL NEW TRACK.;[07] VERIFIED CORRECTIVE ACTIONS 4 AND 6.;[08] INSTALLED NEW AFT CARGO BAY TIEDOWN TRACK BETWEEN STA 727-867 LBL 17; WL 156 PER DWG 146A7501 REV:- AND DWG 146A7500 REV:A AND SRM 51-40-02.;[09] VERIFIED MEASUREMENT TABLE.;[10] VERIFIED CORRECTIVE ACTION 8.