What was found
CORROSION ON CARGO TRACK IN AFT CARGO BAY, BS 767+6, LBL3. OUT OF LIMITS IAW SRM 53-00-53-1A-2; PARA 4 A, (2), (A), FIG. 103. REMOVED DAMAGED AREA IAW SRM 53-00-53-2R-2; PAR. 4. D. L=3.25' X W=0.90'. RECEIVED MACHINED REPAIR ANGLE. FABRICATED A NEW REPAIR ANGLE IAW SRM 53-00-53-2R-2, FIG. 203, TABLE 205, ITEM 6, ALTERNATIVE 5, REPAIR 2. LOCATED AND DRILLED IAW SRM 51-40-0500G-0, FIG 2 & SRM 53-00-53-2R-2, FIG 203, PARA. 4, ALTERNATIVE 5, REPAIR 2. DETAIL F. APPLIED CHEMICAL CONVERSION COATING IAW SOPM 20-43-03, APPLIED CHEMICAL CONVERSION ON AREA IAW SOPM 20-43-03 & APPLIED PRIMER SOPM 20-41-02. INSTALLED REPAIR ANGLE IAW SRM 53-00-53-2R-2, FIG 203, PARA 4D, ALTERNATIVE 5, REPAIR 2, DETAIL F.