What was found
CORROSION FOUND FWD CARGO RT ZEE CHANNEL, BS 500A - 500D AROUND FASTENER HOLES. REMOVED CORROSION IAW SRM 51-10-02-0G-0. PERFORMED UT THICKNESS ON REWORKED AREA IAW NDTM PART 4, 51-00-00, PROCEDURE 3. FOUND OUT LIMITS IAW SRM 53-00-53-1A-2. REMOVED THE CHANNEL IAW SRM 51-40-02-0G-0. FABRICATED A NEW ZEE CHANNEL SECTION IAW DWG 143A7501 AND INSTALLED.