What was found
R/H BS663 UPPER ATTACH ANGLE IS CRACKED ON VAPOR BARRIER RBL8 WL167.68 / [01] VERIFIED APPLICABILITY OF SRM 57-10-10-2R-5 TO BE CORRECT AND UPDATED MEASUREMENT TABLE;[09] RECIEVED REPAIR PARTS 1EA REPAIR DOUBLER MATERIAL USED 2024T3 CLAD 0.071' LOT# 1452482-1 R.O 889862-SWA AND REPAIR FILLER 1EA MATERIAL USED 2024T3 CLAD 0.063' LOT# 1489987-1 R.O 889863-SWA VERIFIED MATERIAL AND HEAT TREATMENT IAW SRM 57-10-10-2R-5 REP.5.[13] INSTALLED REPAIR PARTS AND FASTENERS AT BS 663 RBL 6-22 WL 167 PERFORMED BONDING TEST ON RIVETS; TEST PASSED TOOL USED ATS312 DUE DATE O7/2023;IAW SRM 57-10-10-2R-5 REP.5 PAR 4M AND SWPM 20-20-00 PAR15. CAP SEAL OF FASTENERS INSIDE FUEL CELL IS DOCUMENTED ON CARD TTG8Q00FRQHT STEP 5;