What was found
R/H BS663 UPPER ATTACH ANGLE IS CRACKED ON VAPOR BARRIER RBL8 WL167.68 / [01] VALIDATED APPLICABILITY OF SRM 57-10-10-2R-5;[06] RECEIVED SPLICE ANGLE RO#891808-SWA-1 AND REPLACEMENT ANGLE RO#891808-SWA.;[07] HFEC INSPECTED OPEN HOLES IAW 737 NDTM PART 6 51-00-00 PROCEDURE 16. <BR>NO CRACKS NOTED. <BR>EQUIP USED: <BR>-NORTEC 600 ID: ATS2353 CAL DUE: 01/23 <BR>-MINIMITE ID: ATS1411 CAL DUE: 07/23;[08] VERIFIED CORRECTIVE ACTION #3;[09] VERIFIED CORRECTIVE ACTION #3;[10] VERIFIED CORRECTIVE ACTION 6.<BR>PERFORMED A DETAILED INSPECTION OF THE REPAIR AREA AND THE UNDERLYING STRUCTURE IAW SRM 57-10-10-2R-5 STEP 4. D.;[11] LOCATED; DRILLED; TRIMMED; DEBURRED; APPLIED CHEMICAL CONVERSION COATING AND PRIMERED REPAIR PARTS @ RH BS663 VAPOR BARRIER UPPER ATTACH ANGLE RBL8-RBL20 WL167.68 IAW SRM 57-10-10-2R-5.;[12] OK TO INSTALL REPAIR PARTS @ BS663 VAPOR BARRIER UPPER ATTACH ANGLE RBL8-RBL20 WL167.68.;[13] VERIFIED CORRECTIVE ACTION 11.<BR>OK TO INSTALL REPAIR PARTS;[14] INSTALLED REPAIR PARTS @RH BS663 VAPOR BARRIER UPPER ATTACH ANGLE RBL8-RBL20 WL167.68 IAW SRM 57-10-10-2R-5. BOND CHECK GOOD IAW SRM 57-10-10-2R-5. BONDING METER ID: E9332 S/N: 1009 DUE:10/2023.;