What was found
CRACKED VAPOR BARRIER BULKHEAD PRESSURE DECK WEB UPPER ATTACH ANGLE, BS 663, LBL 5, WL 165. DAMAGE FOUND OUT OF LIMTS IAW SRM 57-10-10-1A-2. PERFORMED DVI OF REPAIR AREA AND UNDERLYING STRUCTURE, NO DAMAGE IAW SRM 51-00-06. FABRICATED A REPLACEMENT ANGLE IAW SRM 51-30-01.LOCATED AND DRILLED IAW 51-40-05. ] ACCOMPLISHED OPEN HOLE INSPECTION, NO CRACKS IAW NDTM PART 6; 51-00-00, PROCEDURE 16. APPLIED TREATMENT AND PRIMER AT REPAIR AREA AND REPAIR IAW SRM 51-20-01 & SOM 20-41-02. INSTALLED THE REPAIR IAW SRM 57-10-10-2R-5.