What was found
RIGHT UPPER VAPOR BARRIER ANGLE WAS CRACKED, RBL8. CUT DAMAGED AREA IAW SRM 51-10-02-0G-0, AND 57-10-10-2R-5. PERFORMED HFEC ROTO INSPECTION OF ALL EXISTING FASTENER HOLES IN THE REPAIR AREA IAW NDT PART 6, 51-00-00, PROCEDURE 16. NO CRACKS NOTED. FABRICATED A REPAIR IAW SRM 57-10-10-2R-5- REPAIR 5. LOCATED AND DRILLED THE REPAIR IAW SRM 51-40-05-0G-0. INSTALLED REPAIR PARTS AT RT UPPER VAPOR BARRIER IAW SRM 51-40-02-0G-0, AND SRM 57-10-10-2R-5.