What was found
CRACK AROUND THE FASTENER AT NR 3 SLAT LOWER SURFACE REMOVED DAMAGE IAW SRM 57-42-01-2R-8 REPAIR 8 PAR 4.F(1). HFEC INSPECTED CUTOUT AREA IAW NDTM PART 6 51-00-00 PROCEDURE 23 FABRICATED, LOCATED, DRILLED, DEBURRED, APPLIED CHEMICAL CONVERSION COAT, PRIMED REPAIR DOUBLER, AND FILLER IAW SRM SRM 57-42-01-2R-8, REPAIR 8, PAR 4.F(3)-(9). INSTALLED COUNTERSINK REPAIR WASHERS IAW SRM SRM 57-42-01-2R-8, REPAIR 8 PAR 4.F(3)(G). INSTALLED THE DOUBLER AND FILLER IAW SRM 57-42-01-2R-8, REPAIR 8, PAR 4.H(1-3).