What was found
CORROSION ON AFT CARGO, CARGO TRACK, LBL 3, BS 767+6. EVALUATED REWORKED AREA AND FOUND OUT ALLOWABLE DAMAGE LIMITS IAW SRM 53-00-53-1A-2, ALLOWABLE DAMAGE 2, FIGURE 103, DETAIL D. REMOVED UPPER FLANGE OF JOGGLE AREA ON THE CARGO TRACK IAW SRM 53-00-53-2R-2, STEPS 4 D. ACCOMPLISHED HFEC INSPECTION ALONG THE CUT EDGES IAW NDTM D6-37239, PART 6, 51-00-00, PROC 23, NO CRACKS FOUND. FABRICATED, LOCATED, AND DRILLED A CHANNEL IAW SRM 51-40-05, AND SRM 53-00-53-2R-2, REPAIR 2, FIG 203. APPLIED CHEMICAL CONVERSION COATING ON REPAIR CHANNEL IAW SOPM 20-41-02. APPLIED PRIMER ON THE REPAIR CHANNEL IAW SRM 51-20-01-0G-0. INSTALLED THE REPAIR CHANNEL ON THE CARGO TRACK IAW SRM 53-00-53-2R-2, AND SRM 51-40-02-0G-0.