What was found
CORROSION ON BS 986 FLOORBEAM AT RBL 45. REMOVED CORROSION AND FOUND TO BE OUT OF LIMITS 53-70-51-1A-1 STEP 4H 2-B FIG 103 N. CUT OUT DAMAGED AREA IAW SRM 53-70-51-2R-6, FLAP PEENED BLENDED AREA IAW SRM 53-70-51-2R-6 STEP 4-E AND SOPM 20-10-03. LOCATED, DRILLED, COUNTERSUNK, TRIMMED TO SIZE, DEBURRED, AND APPLIED CHEMICAL CONVERSION COATING TO REPAIR PARTS AND TRIM OUT IAW SRM 53-70-51-2R-6 PARA. 4F(4); 4G-K; TABLE 204; FIGURE 205. APPLIED PRIMER TO REPAIR PARTS AND TRIM OUT AREA PER SRM 53-70-51-2R-6 PARA. 4L. INSTALLED THE REPAIR IAW SRM 51-40-02-0G-0 AND SRM 53-70-51-2R-6.