What was found
SUPPORT CHANNEL BETWEEN BS 170-177; LBL 3-RBL 3 WL 208 IS CORRODED CORRECTION BODY STATION: SUPPORT CHANNEL BETWEEN BS 260-277 LBL 3-RBL 3 WL 208 IS CORRODED<[01] REMOVED CORROSION ON SUPPORT CHANNEL BETWEEN BS 260-270; LBL 3-RBL 3 WL 208 P/N 141A5211-1; AREA OT=0.040; RT=0.032; L=1.900'W=1.200''; X=0.008. FOUND TO BE OUT LIMITS IAW SRM 53-10-51-1A-1 FOR ALLOWABLE DAMAGE AND SRM 53-10-51-0L-2 FOR IDENTIFICATION AND IT WILL BE REPAIRABLE BY REPLACEMENT I.A.W 51-10-02-0G PAR 9C.;[02] VERIFIED CORRECTIVE ACTION 1;[03] REMOVED SUPPORT CHANNEL BETWEEN BS 260-270; LBL 3-RBL 3 WL 208 P/N 141A5211-1 I.A.W SRM 51-40-02-0G-0.;[04] LOCATED AND DRILLED NEW SUPPORT CHANNEL BETWEEN BS 170-177; LBL 3-RBL 3 WL 208 IAW SRM 51-40-05-0G-0 AND BOEING DWG 141A5211 OK TO INSTALL;[05] VERIFIED CORRECTIVE ACTION 4.;[06] REMOVED AND REPLACED CHANNEL BETWEEN BS 170-177; LBL 3-RBL 3 WL 208 IAW SRM 51-40-02-0G-0 AND BOEING DWG # 141A5210;[07] VERIFIED CORRECTIVE ACTION 6.