Service difficulty report · Support · Boeing 7377BD

Difficulty date
December 14, 2022
Submitted
January 26, 2023
Operation
Air carrier
Aircraft
N7713A
Make and model
Boeing 7377BD
Aircraft serial
33919
Aircraft time
57,380 hours, 30,141 cycles
Part
Support
Condition
Corroded
Location
Bs 867-907
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON AFT CARGO BAY FLOOR TO SIDEWALL SUPPORT AT RBL 21 BS 867+3; BS 867+6; BS 867+9; BS 907+3; BS 907+14; BS 907+19.<[01] VERIFIED APPLICABILITY SRM 53-60-53-01-2 AND SRM 53-70-53-01-2 FOR IDENTIFICATION AND SRM 53-00-53-1A-2 FOR ALLOWABLE DAMAGE.<BR><BR>REMOVED CORROSION ON AFT CARGO BAY FLOOR TO SIDEWALL SUPPORT AT RBL 21 BS 907+14 IAW SRM 51-10-02.<BR><BR>EVALUATED DAMAGE REMOVAL AT BLENDED AREA L=0.800' W=0.700' ORIGINAL THICKNESS 0.040' PER BAC1496-377 REMAINING 0.033' LOSS 0.007'; MAX MAT REMOVE ALLOWABLE 0.004'; FOUND TO BE OUT OF LIMITS IAW SRM 53-00-53-1A-2 PARA 4A (2) FIG 103 DETAIL D.<BR>TOOL ID: ATS1672 S/N: 65092939 DUE:03/2023;[02] VERIFIED CORRECTIVE ACTION 1.<BR>COMPLETED STEPS 1-6;[03] FABRICATED; LOCATED AND DRILLED NEW FLOOR TO SIDEWALL SUPPORT RBL 21 FROM BS 867 TO BS 947 IAW SRM 53-60-53-0L-2; DWG 147A7501 AND DWG 146A7502.MATERIAL USED BAC1496-377 #7075 T62 LOT.1508577-1.<BR>OK TO TREAT AND PRIME;[04] VERIFIED CORRECTIVE ACTION 3; OK TO TREAT AND PRIME GIVEN.;[05] APPLIED ON AFT CARGO BAY FLOOR TO SIDEWALL SUPPORT AT RBL FROM BS 867 TO BS 947. CHEMICAL CONVERSION COATING AND PRIMER IAW SRM 51-20-01 AND SOPM 20-41-02.;[06] VERIFIED ASSEMBLY OF THE BS867-947 FLOOR TO SIDEWALL SUPPORT AND APPLICATION OF CONVERSION TREATMENT AND PRIMER.;[07] VERIFIED MEASUREMENT TABLE- WORKSCOPE COMPLETE

More about the Boeing 737-7BD