Service difficulty report · Angle · Boeing 7377H4

Difficulty date
December 30, 2022
Submitted
January 31, 2023
Operation
Air carrier
Aircraft
N213WN
Make and model
Boeing 7377H4
Aircraft serial
34217
Aircraft time
58,853 hours, 35,162 cycles
Part
Angle
Part number
NOTREPORTED
Condition
Corroded
Location
Zn 200 Fus Top
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION AT FWD CABIN WET AREA FLOOR SUPPORT ANGLE FASTENER HOLE @ RBL 11 STA 294.5 MKD DOT<[01] REMOVED CORROSION AT FWD CABIN WET AREA FLOOR SUPPORT ANGLE;AT FASTENER HOLE;RBL 11'' STA 294.5'' PER B 737-700 SRM 51-10-02-0G-0.;[02] VERIFIED STEP #1.;[03] PERFORMED UT THICKNESS INSP. ON REWORKED AREAS IAW B737 NDT PART 4; 51-00-00; PROCEDURE 3. MIN. THICKNESS 0.048'<BR>TOOL: OLYMPUS 27MG B/C: 172139 DUE: 04/13/2023;[04] AFTER NDT CHECK;FOUND REWORKED AREA OUT OF LIMITS;PER B 737-700 SRM 53-10-51-1A-1;ORIGINALL THICKESS .080'' ; MATERIAL REMOVED .032'';MATERIAL REMAINING .048''.;[05] INSTALLED EWIS PROTECTION ;ON FAULT #TTG8Q003DV3A;[06] REMOVED FLOOR SUPPORT ANGLE AT FWD CABIN AT STA 294.5 TO STA 312;RBL 11''.PER B 737-700 SRM 51-40-02-0G-0.;[07] LOCATED AND DRILL NEW FLOOR SUPPORT AT STA 294.5 TO STA 312 ;RBL 11'';PER B 737-700 SRM 51-10-02-0G-0.;[08] VERIFIED STEPS 4; 5; 6 AND 7.;[09] OK TO INSTALL NEW FLOOR SUPPORT.;[10] INSTALLED FLOOR SUPPORT ANGLE;AT STA 294.5 TO STA 312;RBL 11''.PER B 737-700 SRM 51-40-02-0G-0.;[11] EWIS PROTECCION WILL BE REMOVED ON FAULT #TTG8Q003DV3A;[12] VERIFIED STEPS:10 AND 11.

More about the Boeing 737-7H4