What was found
CRACK ANGLE FLOOR STRUCTURE LOCATED BS 695 RBL 24.75 CENTER SECTION 2023-36336<[01] TOOLS USED: TEMPERATURE CONTROLLER: P/N: P3015GOES00000; S/N: 112031023; DUE DATE: 01-FEB-23; TEMPERATURE CONTROLLER: P/N: 48VFL11; S/N: AE-31448; DUE DATE: 14-JUN-23.;[02] REPLACED ANGLE LOCATED AT LEVEL FLOOR ESTRUCTURE BSTA 695 AND RBL 24.75 IAW RSM B737-700 51-10-02 AND DWG 273A9110 REV A AND 111A6002 REV A.;[03] CORRECTIVE ACTION 2 COMPLETE AND CERTIFIED RII <BR><BR>REPLACED ANGLE LOCATED AT LEVEL FLOOR ESTRUCTURE BSTA 695 AND RBL 24.75 IAW RSM B737-700 51-10-02 AND DWG 273A9110 REV A AND 111A6002 REV A.;[04] CORRECTED ACTION 2:REPLACED ANGLE LOCATED AT LEVEL FLOOR ESTRUCTURE BSTA 695 AND RBL 24.75 IAW RSM B737-700 51-10-02 AND DWG 273A9110 REV A AND 111A6002 REV A. SEE INDIVIDUAL SIGNOFF BELOW.;[05] CORRECTED CORRECTIVE ACTION 3<BR><BR>CORRECTIVE ACTION 4 COMPLETE AND CERTIFIED RII <BR><BR>REPLACED ANGLE LOCATED AT LEVEL FLOOR ESTRUCTURE BSTA 695 AND RBL 24.75 IAW RSM B737-700 51-10-02 AND DWG 273A9110 REV A AND 111A6002 REV A. SEE INDIVIDUAL SIGNOFF BELOW.