What was found
R/H BS663 UPPER ATTACH ANGLE IS CRACKED ON VAPOR BARRIER RBL8 WL167.68<[01] VALIDATED APPLICABILITY OF SRM 57-10-10-2R-5 [03] REMOVED DAMAGED SECTION OF R/H BS663 UPPER ATTACH ANGLE RBL8-RBL20 WL167.68 IAW SRM 57-10-10-2R-5.[06] VERIFIED CORRECTIVE ACTION 1-3.[12] VERIFIED CORRECTIVE ACTION 11. OK TO PRIME.;[13] PRIMERED REPAIR PARTS @ BS663 UPPER ATTACH ANGLE RBL8-RBL20 WL 167.68 IAW SRM 57-10-10-2R-5. OK TO INSTALL.;[14] VERIFIED CORRECTIVE ACTION 13. OK TO INSTLL REPAIR.;[15] VERIFIED MEASUREMENT TABLE.;[16] INSTALLED R/H BS663 UPPER ATTACH ANGLE REPAIR ON VAPOR BARRIER RBL8-RBL20 WL 167.68 IAW SRM 57-10-10-2R-5. BOND CHECK GOOD.;[17] CAP SEALING AND LEAK CHECK OF INTERNAL SIDE OF FASTENERS COMMON TO REPAIR ANGLE AND FUEL TANK @ BS663 RBL8-RBL20 WL 167.68 WILL BE ACCOMPLISHED ON CC#TTG8Q00GZCTK.;[18] BONDING METER ID:ATS2787 SN:DC007132 DUE:08/2023;[19] VERIFIED CORRECTIVE ACTION 16-18.;[20] REMOVED EWIS PROTECTION ON FWD AND AFT SIDE OF VAPOR BARRIER BS663 UPPER ATTACH ANGLE RBL8-RBL20 WL167.68 IAW AMM 20-60-07-913-801.;[21] CAP SEALED EXTERNAL SIDE OF FASTENERS COMMON TO FUEL TANK AND WHEEL WELL SIDE OF REPAIR. FILLET SEALED REPAIR; AND APPLIED CIC TO REPAIR PARTS @ BS663 UPPER ATTACH ANGLE RBL8-RBL20 WL 167.68 IAW SRM 57-10-10-2R-5.;[22] VERIFIED CORRECTIVE ACTIONS 20 AND 21. VERIFIED MEASUREMENT TABLE