Service difficulty report · Support · Boeing 7377H4

Difficulty date
January 12, 2023
Submitted
February 10, 2023
Operation
Air carrier
Aircraft
N279WN
Make and model
Boeing 7377H4
Aircraft serial
32532
Aircraft time
52,335 hours, 31,548 cycles
Part
Support
Condition
Elongated
Location
Zn 100 Fus Lower
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

MAIN CABIN FWD WET AREA STA 270 RBL 43' FASTENER HOLE ELONGATED<[01] REAMED ELONGATED HOLE AT MAIN CABIN FWD WET AREA STA 270 RBL 43 FINAL SIZE FOUND 0.375 DIAMETER TOOL USE D/C 172991 CAL: DUE DATE 15/07/23 REF SRM 51-10-02-0G-0 `;[02] PERFORMED ROTO INSP ON REAMED HOLE AT MAIN CABIN WET AREA STA 270 RBL43 IAW B737 NDT P6 51-00-00 PROC.16; NO CRACKS<BR>TOOL USED : NORTEC 600 B/C 172389 CALDUE: 03/23;[03] VERIFIED STEP 1.;[04] REMOVED FLOOR SUPPORT AT MAIN CABIN STA 270 RBL 43' AS PER SRM 51-40-02;[05] RECEIVED NEW FLOOR SUPPORT P/N: 141A5751-2; FROM MACHIN SHOP; ISSUE TAG: WN26388; PO# 1792296; REQUEST PENETRANT INSPECTION; AS PER DWG. 141A5751.;[06] VERIFIED STEPS 4 AND 5;[07] PERFORMED PENETRANT INSP AT FLOOR SUPPORT IAW BOEING SOPM 20-20-02; NO CRACKS NOTED<BR>TOOL USED : TFS4 B/C 174662 CALDUE: 31-MAR-23;[08] INSTALLED ALL (HI LOK) ON NEW FLOOR SUPPORT AT MAIN CABIN FWD WET AREA STA 270 RBL 43 REF DWG #141A5710. PENDING X5 NUT PLATE TO BE INSTALLED.;[09] LATE ENTRY: OK TO INSTALL FLOOR SUPPORT. VERIFIED STEP 8.;[10] COMPLETED INSTALLATION OF NEW FLOOR SUPPORT AT MAIN CABIN FWD WET AREA STA 270 RBL 43 AS PER SRM 51-40-02 AND DWG 141A5710;[11] STEPS 8 AND 9 ARE RII STEPS;[12] VERIFIED STEP 10;[13] TASK C/W

More about the Boeing 737-7H4