What was found
CORR0SION FLOOR TO SIDEWALL SUPPORT BS727+5; BS727A+10; BS727B+2-BS727C+14; BS727D+2; BS727D+8-BS767 RBL22<[01] PARTIAL STEPS #1- 7.;[02] VERIFIED APPLICABILITY SRM 53-60-53-0I-2 IDENTIFICATION 2 AND SRM 53-00-53-1A-2 ALLOWABLE DAMAGE 2.;[03] CORRECTED STEP# 5 WL156.;[04] VERIFIED STEPS 1-7 AND CORRECTIVE ACTION 2.;[05] RECEIVED EXTRUSION BAC1496-377 LOT. 1515191-1.<BR>LOCATED AND DRILLED BTW. BS 727 - BS 767 RBL 23 WL 156 IAW SRM 51-40-05 AND DWG# 146A7500; DWG# 146A7502 REV: A.<BR>OK TO APPLY TREAT AND PRIME.;[06] VERIFIED CORRECTIVE ACTION STEP 5.VERIFIED OK TO TREAT AND PRIME.;[07] APPLIED CHEMICAL CONVERSION COATING AND PRIMER ON NEW FLOOR TO SIDEWALL SUPPORT AND INSTALLED NUT PLATES IAW SRM 51-20-01 AND SOPM 20-41-02. AND SRM 51-40-02 AND DWG# 146A7502 REV:A;[08] VERIFIED CORRECTIVE ACTION STEP 7. VERIFIED MEASUREMENT TABLE AND TASK CARD COMPLETE.