What was found
CORROSION ON AFT CARGO BAY RAIL AT RBL 3 BS 767+6 WL 156<[01] CORROSION ON RAIL WAS FOUND TO BE OUT OF LIMITS DUE BEING COMMON TO AN EXISTING REPAIR.;[02] VERIFIED CORRECTIVE ACTION STEP 1.;[03] VERIFIED APPLICABILITY IAW SRM 51-10-02-0G-0 AND SRM 53-00-53-2R-3;[04] REMOVED; LOCATED AND DRILLED REINFORCING CHANNEL ON AFT CARGO BAY RAIL AT RBL 3; BS 767+6; WL 156 IAW SRM 51-40-02-0G-0 AND SRM 53-00-53-2R-3. OK TO INSTALL;[05] INSTALLED REINFORCING CHANNEL ON AFT CARGO BAY RAIL AT RBL 3; BS 767+6; WL 156 IAW SRM 51-40-02-0G-0 AND SRM 53-00-53-2R-3.;[06] CONCUR WITH APPLICABILITY OF SRM 51-10-02-0G-0 AND SRM 53-00-53-2R-3.<BR>VERIFIED CORRECTIVE ACTION ITEM 4.<BR>PROVIDED OKAY TO INSTALL OF REPAIR PART GIVEN PRIOR TO INSTALLATION.<BR>VERIFIED MEASUREMENT TABLE COMPLETED.;[07] RII VERIFIED CORRECTIVE ACTION ITEM 5.