What was found
BS 540 CENTER PANEL BREAK IS CRACKED COMMON TO FWD HI-LOK AT LBL 1<[01] REMOVED AND REPLACED FLOOR BOARD CENTER PANEL BREAK AT BS540 LBL1; AND MATCHED DRILLED FLOOR BOARD HOLES IAW SRM 51-40-02 AND SRM 51-40-05;[02] CERTIFIED CORRECTIVE ACTION 1;[03] NO ALLOWABLE DAMAGE STATED IN THE SRM. PART REPAIRED BY REPLACEMENT IAW SRM 51-10-02-0G-0 AND BOEING DWG 143A0060.;[04] CERTIFIED CORRECTIVE ACTION 3;[05] VERIFIED CORRECTIVE ACTION STEPS 1 AND 3.;[06] VERIFIED MEASUREMENT TABLE AND TASK CARD COMPLETE.