Service difficulty report · Structure · Boeing 7377H4

Difficulty date
January 25, 2023
Submitted
March 6, 2023
Operation
Air carrier
Aircraft
N955WN
Make and model
Boeing 7377H4
Aircraft serial
36671
Aircraft time
38,739 hours, 23,607 cycles
Part
Structure
Condition
Corroded
Location
Zn 100 Fus Lower
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON MOP-SILL RBL 54 BS 967+12; RBL 52 BS 967+14; RBL 53 BS 967+17; RBL 51 BS 967+18; RBL 47 BS 986.5.<[01] VERIFIED APPLICABILITY OF SRM CH 53-70-15-1A-1 FOR ALLOWABLE DAMAGE TO LOWER MAIN SILL INNER CHORD. REMOVED CORROSION ON MOPSILL AND FOUND TO BE OUT OF LIMITS WITH A MAX MATERIAL LOSS OF .015. USING TOOL ID# ATS1225 NSN CAL. DATE 08/22 DUE 08/23.;[02] VERIFIED CORRECTIVE ACTION #1;[03] STARTED REMOVINGAFT RH MOP-SILL IAW SRM 51-40-02.;[04] REMOVED AFT RH MOP-SILL IAW SRM 51-40-02.;[05] LOCATED AND DRILLED NEW ASD R/H MOPSILL P/N 147A 8540-8 I.A.W SRM 51-40-05-0G-0; SRM 51-40-02; AND DWG. 147A8501.;[06] LOCATED AND DRILLED NEW ASD R/H MOPSILL P/N 147A 8540-8 I.A.W SRM 51-40-05-0G-0; SRM 51-40-02; AND DWG. 147A8501. BS 893-1008 RBL 50-65.;[07] LOCATED AND DRILLED MOPSILL IAW SRM CH 51-40-05 OK TO INSTALL.;[08] OKAY TO INSTALL MOPSILL GIVEN.;[09] INSTALLED ALL PERMANENT AND TEMPORARY FASTENERS IN MOPSILL IAW SRM CH 51-40-02 AND DRAWING #147A8501 BEFORE SEALANT CURE TIME. 870-C-20 MIXED AT 06:30 UTC.;[10] VERIFIED CORRECTIVE ACTION 9.;[11] INSTALLED 100% OF PERMANENT FASTENERS IN MOP-SILL AT RBL 54 BS 893 TO BS 1020 IAW SRM 51-40-02-0G-0 AND DWG #147A8501.;[12] CERTIFIED CORRECTIVE ACTION 11;[13] VERIFIED FASTENER INSTALLATION CORRECTIVE ACTION 11 AND 12;[14] VERIFIED JOB COMPLETE AND MEASUREMENT TABLE

More about the Boeing 737-7H4