What was found
CORROSION ON AFT CARGO BAY FLOOR TO SIDEWALL SUPPORT AT RBL 21 BS 727A; BS 727C+6; BS 727D+10; BS 727D+14; BS 727D+18; BS 727E+6; BS 727E+10; BS 727E+14.<[01] VERIFIED APPLICABILITY SRM 53-60-53-0I-2 IDENTIFICATION 2 AND SRM 53-00-53-1A-2 ALLOWABLE DAMAGE;[14] VERIFIED CORRECTIVE ACTIONS STEP 13; DRY TIME: 03:00 UTC 10FEB2023. OK TO INSTALL GIVEN.;[15] INSTALLED NEW SIDEWALL SUPPORT AT RBL 21 BS 727-BS 767 I.A.W SRM 51-40-02-0G-0 AND DWG 146A7500.;[16] VERIFIED CORRECTIVE ACTION #15.;[17] VERIFIED MEASUREMENTS.