What was found
FLIGHT DECK FLOOR REPAIR - CRACK NOTED IN THIRD LAYER OF FASTENER HOLE AT BS 254 LBL 4 WL 208. MARKED LOCATION.<[01] REMOVED FITTING SUPPORT BS 251 BETWEEN LBL 3.8 - LBL 15.3 FLIGHT DECK FLOOR WEB PER SRM 51-40-02;[02] LOCATED AND DRILLED NEW STIFFENER P/N:141A5136-11; LOT#1519516-1 AT BS 252; WL 208 BETWEEN LBL 3.8 AND LBL 15.3 PER SRM 51-40-05 AND DWG#141A5100 SH 158. OK TO INSTALL.;[03] VERIFIED CORRECTIVE ACTION STEP 2. VERIFIED OK TO INSTALL.;[04] INSATALLED NEW STIFFENER P/N:141A5136-11 BS 252; WL 208 BETWEEN LBL 3.8 AND LBL 15.3 PER SRM 51-40-02 AND DWG#141A5100 SH 158.;[05] VERIFIED CORRECTIVE ACTION STEP 4.;[06] COMPLETED STEP 2.;[07] VERIFIED STEP 2.;[08] STEP 1 COMPLETED;[09] VERIFIED STEP 1.;[10] REPAIRED BY REPLACEMENT STIFFENER P/N 141A5136-11 IAW SRM 51-10-02-0G-0 PARAGRAPH 9