Service difficulty report · Support · Boeing 7378H4

Difficulty date
February 2, 2023
Submitted
March 10, 2023
Operation
Air carrier
Aircraft
N8524Z
Make and model
Boeing 7378H4
Aircraft serial
36970
Aircraft time
20,203 hours, 9,817 cycles
Part
Support
Condition
Corroded
Location
Zn 100 Fus Lower
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION AFT CARGO BAY R/H FLOOR TO SIDEWALL SUPPORT PLATE HAS MULTIPLE AREAS AROUND NUT PLATE HOLES BS727H+9' TO BS767 RBL22 WL156<[01] EVALUATED CORROSION AT ALL LOCATIONS; FOUND DEEPEST LOCATION TO BE AT BS 727I+11' REMOVED 0.015' IN AN AREA OF 1'X1' ORIGINAL THICKNESS 0.040' FOUND TO BE OUT OF LIMITS PER SRM 53-00-53-1A-2 USING ATS TOOL ID ATS 2473 DUE 08/2023;[02] VERIFIED CORRECTIVE ACTION STEP 1.;[03] REMOVED DAMAGED SECTION ACB RH FLOOR TO SIDEWALL SUPPORT BS 727G+10 TO 767. RBL22; IAW SRM 53-00-53-2R-5.;[04] FABRICATED REPAIR PARTS FOR ACB RH FLOOR TO SIDEWALL SUPPORT; BS 727G+10 TO 767; RBL22. IAW SRM 51-40-02-0G-0; SRM 51-40-05-0G-0; SRM 53-00-53-2R-5. APPLIED CHEMICAL CONVERSION COATING IAW SRM 51-20-01-0G-0. MATERIAL; BAC1496-377#7075T62; LOT# 1515191-1 AND OK TO PRIME.;[05] VERIFIED CORRECTIVE ACTION 3 AND 4 OK TO PRIME GIVEN;[06] PRIMED AND ASSEMBLED REPIR PARTS FOR ACB RH FLOOR TO SIDEWALL SUPPORT; BS 727G+10 TO 767; IAW SRM 53-00-53-2R-5. EA M-22-153-01550 AND OK TO INSTALL.;[07] VERIFIED CORRECTIVE ACTION 6 WITH OK TO INSTALL GIVEN;[08] INSTALLED REPAIR PARTS FOR ACB RH FLOOR TO SIDEWALL SUPPORT; BS 727G+10 TO 767; RBL22; IAW SRM 51-40-02-0G-0; SRM 53-00-53-2R-5; EA 22-153-01550.;[09] ' THE DAMAGE WAS REPAIRED PER SRM 53-00-53-2R-5 (REPAIR 5) AND EA M-22-153-01550'.;[10] FINAL INSPECTION. JOB COMPLETE.;[11] FINAL INSPECTION. JOB COMPLETE.;[12] VERIFIED MEASUREMENTS TABLE.

More about the Boeing 737-8H4