Service difficulty report · Support · Boeing 7378H4

Difficulty date
February 2, 2023
Submitted
March 10, 2023
Operation
Air carrier
Aircraft
N8524Z
Make and model
Boeing 7378H4
Aircraft serial
36970
Aircraft time
20,203 hours, 9,817 cycles
Part
Support
Condition
Corroded
Location
Zn 100 Fus Lower
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CARGO BAY L/H FLOOR TO SIDEWALL SUPPORT PLATE MULTIPLE AREAS AROUND NUT PLATE HOLES BS727G+6' TO BS787+2' LBL21.5 WL156<[01] EVALUATED CORROSION AT ALL LOCATIONS; FOUND DEEPEST LOCATION TO BE AT BS 727J+11' REMOVED 0.020' IN A AREA OF 1'X1' ORIGINAL THICKNESS 0.040' FOUND TO BE OUT OF LIMITS PER SRM 53-00-53-1A-2 USING ATS TOOL ID ATS 2473 DUE 08/2023;[02] VERIFIED CORRECTIVE ACTION STEP 1.;[03] REMOVED DAMAGED SECTION OF ACB LH FLOOR TO SIDEWALL SUPPORT; BS727F+10 TO 787+7; IAW SRM 53-00-53-2R-5.;[04] FABRICATED REPAIR PARTS FOR ACB LH FLOOR TO SIDEWALL SUPPORT; BS727F+10 TO 787+7; IAW SRM 53-00-53-2R-5; SRM 51-40-02-0G-0; SRM 51-40-05-0G-0. MATERIAL; BAC1496-377#7075T62. LOT#1515191-1. AND OK TO PRIME. EA; M-22-153-01550.;[05] AND APPLIED CHEMICAL CONVERSION COATING IAW SRM 51-20-01-0G-0.;[06] VERIFIED CORRECTIVE ACTION #4; 5;[07] PRIMED AND ASSEMBLED REPAIR PARTS IAW SRM 53-00-53-2R-5. AND OK TO INSTALL.;[08] VERIFIED CORRECTIVE ACTION 7 WITH OK TO INSTALL GIVEN;[09] INSTALLED ACB LH FLOOR TO SIDEWALL SUPPORT; BS727F+10 TO 787+7; LBL21.5; IAW SRM 51-4-02-0G-0;SRM 53-00-53-2R-5; DWG 146A7500;[10] ADDING EA; M-22-153-01550 TO STEP 9.;[11] THE DAMAGE WAS REPAIRED PER SRM 53-00-53-2R-5 (REPAIR 5) AND EA M-22-153-01550'.;[12] VERIFIED CORRECTIVE ACTION 9; 10 AND 11;[13] JOB COMPLETE; VERIFIED MEASUREMENT TABLE.