What was found
FWD CARGO BAY - FWD SHIELD HAS CORROSION RBL 23 BS 420+16; BS 420+18.<[01] NO ALLOWABLE DAMAGE LIMITS; IT HAS TO BE REPAIRED BY REPLACEMENT PER SRM 51-10-02-0G-0 STEP 9 C.;[02] VERIFIED CORRECTIVE ACTION 1;[03] LOCATED AND DRILLED NEW FCB FWD SHIELD RBL 23 IAW SRM 51-40-05 AND DWG#143A8126 . INSTALLATION OF THIS PART WILL BE ON FAULT [TTG8Q004DRF3];[04] COMPLETED MEASUREMENT TABLE;[05] VERIFIED CORRECTIVE ACTIONS 3; 4 AND MEASUREMENT TABLE.