What was found
LEFT HAND 663 VAPOR BARRIER WEB IS CRACKED AT APPROX LBL 38<[01] VARUFIED FABRICATION OF VAPOR BARRIER WEB IN BACK SHOP ON N/R 4457-1000-0001 I.A.W BOING DWG 111A1141 REV:-<BR>NEED TO TRIM AND DRILL WEB;[02] VERIFIED STEP 1 FABRICATION;[03] LOCATED AND DRILLED NEW VAPOR BARRIER WEB IAW SRM 51-40-05-0G-0 AND BOEING DWG# 111A1141 REV:-;[04] VERIFIED STEP 3;[05] FINISHED FABRICATE NEW VAPOR BARRIER WEB N/R 4457-1000-0001 IAW DWG 11A1141 REV:-;[06] VERIFIED ITEM 5;[07] OK TO APPLY TOP COAT;[08] APPLIED TOP COAT NEW WEB IAW DWG 11A1141 REV:-;[09] VERIFIED ITEM 8;[10] VERIFIED FABRICATION OF VAPOR BARRIER IS COMPLETED COMPLETED;[11] VERIFIED STEP 10; JOB COMPLETE; AUDIT C/W