What was found
SPR FUELING CONTROL PANEL IS CORRODED<[01] CORROSION ON BRACKET WAS FOUND TO BE OUT OF LIMITS DUE TO NO LIMITS GIVEN IN THE SRM. PART REPLACEMENT REQUIRED.;[02] REMOVED AND REPLACED FUELING CONTROL PANEL ASSEMBLY IAW AMM 28-41-61-000-801.;[03] VERIFIED ACTION ITEM 2.;[04] UPDATED PARTS INFO;[05] VERIFIED CORRECTIVE ACTION ITEM 1-4.;[06] PERFORMED THE OPERATIONAL TEST OF THE REFUEL QUANTITY INDICATORS IAW MM 28-41-61-400-801 STEP 3H. OPS CHECK GOOD.;[07] COMPLETED STEP 1. VERIFIED CORRECTIVE ACTION 6