What was found
CORROSION ON FLOOR SUPPORT STA 952; RBL 28- RBL 34; WL 208.<[01] REMOVED CORROSION ON FLOOR SUPPORT STA 952; RBL 28-RBL 34; WL 208. FOUND TO HAVE 100% MATERIAL LOSS AROUND FASTENER HOLE AT RBL 30 PER SRM 51-10-02-0G-0; REPLACEMENT OF PART IS APPLICABLE.;[02] REMOVED CORROSION ON FLOOR SUPPORT STA 952; RBL 28-RBL 34; WL 208. FOUND TO HAVE 100% MATERIAL LOSS AROUND FASTENER HOLE AT RBL 30; OUT OF LIMITS PER SRM 51-10-02-0G-0; REPLACEMENT OF PART IS APPLICABLE;[03] ADDED OUT OF LIMITS;[04] VERIFIED CORRECTIVE STEP 2.;[05] LOCATED AND DRILLED NEW FLOOR SUPPORT STA 952; RBL 24- RBL 49; WL 208 IAW SRM 51-40-05-0G-0 AND DWG 147A5650. INSTALLATION TO BE PERFORMED UNDER FLOOR BEAM REPAIR TTG8Q00J0H2X STEP 7.;[06] VERIFIED ITEM 5 CORRECTIVE ACTIONS. INSTALLATION TO BE PERFORMED UNDER FLOOR BEAM REPAIR TTG8Q00J0H2X STEP 7.