What was found
FRAME CRACKED BS400 L/H AT BIN RAIL ATTACH POINT; BETWEEN STR8L-9L<[01] REMOVED DAMAGE ON FRAME BS 440 L/H AT BIN RAIL ATTACH POINT BTW S-8L - S-9L; CUT OUT AREA: L= 1 X W=1' IAW SRM 51-10-02-0G-0;[02] VERIFIED CORRECTIVE ACTION 1.;[03] REQ NDI CUT OUT FOR FREE CRACK CONDITION;[04] HFEC INSPECTED CUTOUT AREA IAW 737 NDTM PART 6 51-00-00 PROCEDURE 23.<BR>NO CRACKS NOTED.<BR>EQUIP USED:<BR>-NORTEC 600 ID: ATS1465 CAL DUE: 09/23;[05] DAMAGE REPAIRED PER EA 23-153-00831.;[06] VERIFIED CORRECTIVE ACTION 5 AND THE MEASUREMENT TABLE.