What was found
AFT CARGO BAY - CORROSION ON SIDEWALL SUPPORT AT RBL 22 BS 727+15; BS 727+118; BS 727B+6; BS 727B+10; BS 727B+14; BS747+2 / RBL 20.5 BS 747+5; BS 747+8.25; BS 747+11.75; BS 747+15.25.<[01] VERIFIED APPLICABILITY OF SRM 53-60-53-01-2 FOR IDENTIFICATION AND SRM 53-00-53-1A-2 FOR ALLOWABLE LIMIT.;[02] PARTIALLY COMPLETED STEPS 1-10;[03] PARTIALLY COMPLETED STEPS 1-10; ALL AREAS OUT OF LIMITS<BR>VERIFIED CORRECTIVE ACTION #1;[04] VERIFIED MEASUREMENTS;[05] VERIFIED MEASUREMENTS;[06] COMPLETED STEPS 1-10; FABRICATED; LOCATED AND DRILLED AFT CARGO BAY SIDEWALL SUPPORT AT RBL 22 BS 727-767 PER SRM#51-40-05-0G-0 AND DWG# 146A7502; USING MATERIAL BAC1496-377#7075T62 LOT#1515191-1<BR>OK TO APPLY CHEMICAL CONVERSION COATING AND PRIMER;[07] VERIFIED STEPS 1 - 10 COMPLETED.<BR>VERIFIED CORRECTIVE ACTION ITEM 6.<BR>OKAY TO APPLY CHEMICAL CONVERSION COATING AND PRIMER GIVEN.;[08] APPLIED CHEMICAL CONVERSION COATING AND PRIMER ON AFT CARGO BAY SIDEWALL SUPPORT BS 727- BS 767 PER SRM#51-20-01 AND SOPM#20-41-02;[09] VERIFIED CORRECTIVE ACTIONS STEP 8.