What was found
CORROSION ON AFT CARGO BAY INTERCOSTAL BS 787+9 RBL 6 WL 153<[01] EVALUATED CORROSION ON INTERCOSTAL BS 787+9 RBL 6 WL 153; FOUND TO BE OUT OF LIMITS DUE TO NO LIMITS IN THE SRM AND REQUIRES REPLACEMENT PER SRM 51-10-0-0G-0;[02] VERIFIED CORRECTIVE ACTIONS STEP 1.;[03] REMOVED AFT CARGO BAY INTERCOSTAL BS 787 TO BS 807 RBL 6 WL 153 PER SRM 51-40-02-0G-0;[04] LOCATED AND DRILLED NEW INTERCOSTAL BS 787 TO BS 807 RBL 6 WL 153 PER SRM 51-40-05-0G-0; AND DWG 146A8130. OK TO INSTALL;[05] VERIFIED CORRECTIVE ACTION 4.<BR>OK TO INSTALL;[06] INSTALLED INTERCOSTAL BS 787 TO BS 807 RBL 6 WL 153 PER SRM 51-40-02-0G-0; AND DWG 146A8130.;[07] VERIFIED ITEM 6 CORRECTIVE ACTIONS.;[08] VERIFIED MEASUREMENTS.