What was found
FWD CARGO BAY - CORROSION ON FWD SHIELD AT WL 156 - RBL 24.75 BS 420+9; BS 420+12.25.<[01] NO ALLOWABLE DAMAGE LIMITS IN SRM REPAIR BY REPLACEMENT;[02] RECEIVED NEW SHIELD P/N:143A8126U21 AND LOCATED AND DRILLED AT FCB RBL 24 BETWEEN BS 420 TO BS 440 IAW SRM 51-40-05 AND DWG:143A8126 ID:0011.;[03] EDIT TO CORRECTIVE ACTION 2. <BR>RECEIVED NEW SHIELD P/N:143A8126U21; LOT:1510082-1 AND LOCATED AND DRILLED AT FCB RBL 24 BETWEEN BS 420 TO BS 440 IAW SRM 51-40-05 AND DWG:143A8126 ID:0011;[04] UPDATED STEP 1.;[05] VERIFIED CORRECTIVE ACTION STEPS 2;3 AND 4. TASK CARD COMPLETE.