What was found
FWD CARGO BAY BAFFLE CRACKED AT FASTENER HOLE BS 500B - BS 500C LBL 21 WL 156<[01] REPAIRED BY REPLACEMENT <BR>LOCATED AND DRILLED NEW FCB BAFFLE AT BS 500B - BS 500C LBL 21 WL156 IAW SRM 51-40-05-0G-0 AND DWG 143A7505;[02] VERIFIED CORRECTIVE ACTION STEP 1.;[03] REQUEST OK TO INSTALL;[04] VERIFIED CORRECTIVE ACTION STEP 3. VERIFIED OK TO CLOSE.;[05] INSTALLED FWD CARGO BAY BAFFLE AT BS 500B - BS 500C LBL 21 WL 156 IAW SRM 51-40-02-0G-0 AND DWG 143A7505;[06] VERIFIED CORRECTIVE ACTION ITEM 5 AND MEASUREMENT FIELDS.;[07] VERIFIED CORRECTIVE ACTION ITEM 5;6 AND MEASUREMENT FIELDS; CARD COMPLETE