What was found
PREVIOUS REPAIR STARTS TO DELAM AT LOWER R/H COMPOSITE BULKHEAD AT BS663 RBL54 WL153.<[01] PART/MATERIAL IDENTIFIED PER SRM 57-10-10-0I-2 FIGURE 2 TABLE 2 ITEM 4<BR>CRACK MIGRATION CAUSING DELAMINATION IN PREVIOUS REPAIR EXCEEDS THE ALLOWABLE LIMITS AS GIVEN IN SRM 57-10-10-1A-2 PARA 4. D. (1).<BR>REPAIR TO BE PERFORMED IAW SRM 51-70-04-2R-10 AS GIVEN IN SRM 57-10-10-2R-2 PARA 1. C. NOTE:;[02] PERFORMED DAMAGE REMOVAL & SURFACE PREPARATION STEPS IAW SRM 51-70-04-2R-10 PARA 4. STEPS A-C.;[03] VALIDATED REPAIR PER SRM 51-70-04-2R-10. DUE TO PROXIMITY OF REPAIR TO DAMAGE ON FAULT TTG8Q00JDQTX THE REPAIR WILL BE COMPLETED ON FAULT TTG8Q00JDQTX;[04] VERIFIED CORRECTIVE ACTIONS 1-3<BR><BR>VERIFIED MEASUREMENTS TABLE<BR><BR>VALIDATED REPAIR PER SRM 51-70-04-2R-10<BR><BR>DUE TO PROXIMITY OF REPAIR TO DAMAGE ON FAULT TTG8Q00JDQTX THE REPAIR WILL BE COMPLETED ON FAULT TTG8Q00JDQTX;[05] VERIFIED CORRECTIVE ACTIONS 1-3<BR><BR>VERIFIED MEASUREMENTS TABLE<BR><BR>VALIDATED REPAIR PER SRM 51-70-04-2R-10<BR><BR>DUE TO PROXIMITY OF REPAIR TO DAMAGE ON FAULT TTG8Q00JDQTX THE REPAIR WILL BE COMPLETED ON FAULT TTG8Q00JDQTX