What was found
CORROSION ON CABIN FLOOR BEAM AT STA 947 LBL 26 (AFT LAV INBD MOUNT)<[01] REMOVED DAMAGE BY CUTTING OFF UPPER CORD OF FLOOR BEAM AT STA 947; LBL 58.60 TO RBL 58.60 PER SRM 53-70-51-2R-5;[02] 1. JAMES RINCK (TECHNICIAN); 24-MAR-2023 03:11 UTC<BR>REMOVED DAMAGE BY CUTTING OFF UPPER CORD OF FLOOR BEAM AT STA 947; LBL 58.60 TO RBL 58.60 PER SRM 53-70-51-2R-5<BR>PERFORMED DVI OF CUT OF UPPER CORD OF FLOOR BEAM AT STA 947; LBL 58.60 TO RBL 58.60 PER SRM 53-70-51-2R-5. NO FURTHER DEFECTS NOTED. OK TO CONTINUE REPAIR.;[12] REMOVED AND REPLACED FLOORBEAM UPPER T-CAP PER SRM 53-70-51-2R-5.;[13] VERIFIED 12. GREGORY BAXTER (TECHNICIAN); 10-APR-2023 17:51 UTC REMOVED AND REPLACED FLOORBEAM UPPER T-CAP PER SRM 53-70-51-2R-5.;[14] C/W REPAIR PER SRM 53-70-510R-5. SEE CORRECTIVE ACTIONS 1-13