What was found
AFT CARGO COMPARTMENT - CORROSION ON AFT FLOOR SUPPORT BULKHEAD AT BS 7947.5 RBL 5.5; RBL 7.25; RBL 9.75; RBL 12; LBL 1.5; LBL 9; LBL 14 WL 155 (MARKED)<[01] VERIFIED APPLICABILITY FOR SRM 51-10-02 PARAG 9.;[02] REMOVED ON ACB;AFT FLOOR SUPPORT BULKHEAD AT BS947.5;RBL20;LBL10;WL155;PART HAS NOT ALLOWABLE DAMAGE ON SRM;PART IS REPAIRABLE BY REPLACEMENT PER SRM 51-10-02 PARAG 9.;[03] CONCUR WITH APPLICABILITY OF SRM 51-10-02 PARA. 9.<BR>VERIFIED CORRECTIVE ACTION ITEM 2.<BR>VERIFIED MEASUREMENT TABLE COMPLETED.;[04] RECEIVED;LOCATED AND DRILLED NEW FLOOR SUPPORT BULKHEAD WITH P/N 149A8118-29;LOT#1519863-1;IAW DGW#149A8117 AND SRM 51-40-05.OK TO INSTALL;[05] VERIFIED CORRECTIVE ACTION ITEM 4. OKAY TO INSTALL NEW FLOOR SUPPORT BULKHEAD GIVEN.;[06] INSTALLED NEW FLOOR SUPPORT BULKHEAD ON ACB;BS947.5;IAW SRM 51-40-02 AND DWG#149A8117.;[07] REJECTION : SEE STEP 1.;[08] STEP 1 COMPLETED<BR><BR>ALL MAINTENANCE ACTIONS COMPLETED;[09] STEP 1 COMPLETE;[10] VERIFIED CORRECTIVE ACTION #6