Service difficulty report · Structure · Boeing 7377H4

Difficulty date
March 15, 2023
Submitted
April 25, 2023
Operation
Air carrier
Aircraft
N957WN
Make and model
Boeing 7377H4
Aircraft serial
41528
Aircraft time
38,518 hours, 23,626 cycles
Part
Structure
Condition
Corroded
Location
Zn 200 Fus Top
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON PAX CABIN MOP SILL FROM STA 294.5+6 TO STA 294.5+10; LBL 56; WL 208 O WL 209.<[01] REMOVED CORROSION ON PAX CABIN MOP SILL STA-294.5+6'' TO STA-294.5+10'' LBL56 WL208-209 IAW SRM 51-10-02-0G-0 L=5.415'' X W=1.520'' D=0.022'' ORIGINAL THICKNESS=0.090'' TOOL USED CALIPER P/N: ATS2738 S/N: A22004095 DUE DATE: 04/2023; DEPTH GAUGE ID: ATS2473 S/N: UNK DUE DATE: 04/2023; EVALUATED AREA AND FOUND TO BE OUT OF LIMITS IAW SRM 53-10-15-1A-1 PART 4.C(2) FIG.108 DETAIL D.;[02] VERIFIED CORRECTIVE ACTION 1 AND MEASUREMENT TABLE.;[03] VERIFIED APPLICABILITY OF SRM 53-10-15-1A-1 FOR ALLOWABLE DAMAGE LIMITS;[04] RECEIVED FROM TOOL ROOM NEW INNER CHORD P/N 654A0004-1073ATSMRO; LOT# 1504220-1<BR>LOCATED; DRILLED AND COUNTERSUNK NEW FED L/H MOP SILL (INNER CHORD) IAW SRM 51-40-05-0G-0 AND BOEING DWG. 141A8110.;[05] VERIFIED CORRECTIVE ACTION #3; #4.;[06] OK TO INSTALL;[07] OK TO INSTALL L/H FED MOP SILL.;[08] 50% OF THE FASTENERS WERE INSTALLED ON L/H MOP SILL (INNER CHORD) IAW SRM 51-40-02-0G-0 AND DWG 141A8110;[09] INSTALLED MOP SILL (INNER CHORD) AT FED FROM BS270 - BS 358; LBL 56 IAW SRM 51-40-02-0G-0; AND BOEING DWG. 141A8110.;[10] UPDATED PARTS INSTALLED.;[11] VERIFIED CORRECTIVE ACTION 8; 9 AND 10.;[12] PARTIAL STEP 1;[13] COMPLETE STEP 1

More about the Boeing 737-7H4