Service difficulty report · Sidewall Support · Boeing 7378H4

Difficulty date
March 27, 2023
Submitted
April 26, 2023
Operation
Air carrier
Aircraft
N8529Z
Make and model
Boeing 7378H4
Aircraft serial
36974
Aircraft time
19,992 hours, 9,666 cycles
Part
Sidewall Support
Condition
Corroded
Location
Zn 100 Fus Lower
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION AFT CARGO BAY L/H FLOOR TO SIDEWALL SUPPORT PLATE MULTIPLE AREAS AROUND NUT PLATE HOLES BS727H+18' TO BS787+6' LBL21.5 WL156<[01] EVALUATED CORROSION AT ALL LOCATIONS; FOUND DEEPEST LOCATION TO BE AT BS 767+11' REMOVED 0.020' IN A AREA OF 1'X1' ORIGINAL THICKNESS 0.040' FOUND TO BE OUT OF LIMITS PER SRM 53-00-53-1A-2 USING ATS TOOL ID ATS 2473 DUE 08/2023;[02] VERIFIED CORRECTIVE ACTION 1 AND MEASUREMENT TABLE;[03] REMOVED DAMAGED SECTION ACB LH FLOOR TO SIDEWALL SUPPORT; BS727H+10 TO 787+10 LBL21.5; IAW SRM 53-00-53-2R-5; SRM 51-40-02-0G-0; ER M-22-153-01550.;[04] FABRICATED REPAIR PARTS FOR ACB LH FLOOR TO SIDEWALL SUPPORT; BS727H+10 TO 787+10; LBL 21.5; APPLIED CHEMICAL CONVERSION COATING; MATERIAL; BAC1496-377#7075T62; LOT#1521599-1. ALL IAW SRM 51-40-02-0G-0; SRM 51-40-05-0G-0; SRM 51-20-01-0G-0; SRM 53-00-53-2R-5; EA M-22-153-01550. AND OK TO PRIME.;[05] VERIFIED CORRECTIVE ACTION 4;[06] PRIMED AND ASSEMBLED REPAIR PARTS; FOR ACB LH FLOOR TO SIDEWALL SUPPORT; BS727H+10 TO 787+10; IAW SRM 53-00-53-2R-5; SRM 51-20-01-0G-0; EA M-22-153-01550INSTALLED REPAIR PARTS FOR ACB LH FLOOR TO SIDEWALL SUPPORT; BS 727H+10 TO 787+10; LBL 21.5; SPLICES AT BS 727H+10 AND BS 787+10; ALL IAW SRM53-00-53-2R-5; 51-40-02-0G-0; DWG 146A7500; EA M-22-153-01550.;[09] THE DAMAGE WAS REPAIRED PER SRM 53-00-53-2R-5 (REPAIR 5) AND EA M-22-153-01550'.;[10] VERIFIED MEASUREMENT TABLE.