What was found
CORROSION ON FLOOR SUPPORT SPLICE AT ACB BS727D+6 LBL20 TO RBL20 WL156.<[01] THIS PART DOES NOT ALLOWABLE DAMAGE LIMITS; IT HAS TO BE REPAIRED BY REPLACEMENT PER SRM 51-10-02 STEP 9;[02] VERIFIED CORRECTIVE ACTION STEP 1.;[03] RECEIVED NEW SPLICE STRIP ASSY AT AFT CARGO BAY BS 727B LBL 20 TO RBL 20 WL 156 P/N 146A9401-8 PO NUMBER 897803/1 AND DWG 146A9401;[04] VERIFIED CORRECTIVE ACTION STEP 3. VERIFIED MEASUREMENT TABLE AND TASK CARD COMPLETE.