What was found
PANEL 661BB HAS SEVERAL PULLED FASTENER HOLE ON AFT END (MARKED)<OUT OF ALLOWABLE DAMAGE LIMITS IAW SRM 57-51-01-1A-1 PARA 4B( REPAIRED PER SRM 51-70-04-2R-9 AS DIRECTED BY SRM 57-51-01-2R-1 PARA 4C AND TABLE 202. <BR><BR>REMOVED DAMAGE TO ALL FASTENER HOLES ON AFT EDGE AND CLEANED AREA IAW SRM 51-70-04-2R-9 PARA 4A-C APPLIED SLURRY MIX OF BMS8-301 LOT#JH2EAA8895 AND MILLED FIBERS LOT#1437038-1 TO ALL DAMAGED FASTENER HOLES IAW SRM 51-70-04-2R-9 PARA 4D-E.;[05] CURED THE SLURRY MIXTURE THEN PERFORMED THE SURFACE PREPARATION PROCEDURES IAW SRM 51-70-04-2R-9 PARA 4. STEPS F-I. REF CAL TOOL HOT BONDER ID ATS532 CAL DUE 06/2023.<BR><BR>USING BMS9-3 STYLE 1581 GLASS LOT 1522395-2 & BMS8-301 EA9390 RESIN LOT JH2EAA8895 FABRICATED REPAIR PLIES IAW SRM 51-70-04-2R-9 PARA 4. STEP J.;[06] IMPREGNATED AND INSTALLED REPAIR PLIES; VACUUM BAGGED; CHECKED FOR LEAKS; LEAK CHECKED GOOD USING VACUUM GAUGE ATS2441 CAL DUE DATE 08/2023 IAW SRM 51-70-04-2R-9 PARA 4J-L.;[07] CURED REPAIR USING HOT BONDER ATS532 CAL DUE DATE 06/2023; UNBAGGED AND LIGHTLY SANDED REPAIR IAW SRM 51-70-04-2R-9 PARA 4M.; LOCATED; DRILLED; AND COUNTERSUNK FASTENER HOLES IAW SRM 51-70-04-2R-9;[12] ADDING 'PARA 4.N.' TO LINE 11.;[13] APPLIED FINISH TO REPAIR AREA IAW SRM 51-70-04-2R-9 PARA 4.P.;[14] VERIFIED CORRECTIVE ACTION 11; 12; 13